FVB Energy Inc. (FVB) in response to a 2017 RPF has prepared a report for The Metropolitan Government of Nashville and Davidson County to summarize the assessment of the economic viability of the Metro Nashville District Energy System and provide options pertaining to different scenarios for the future of the system. Four scenarios have been developed and compared in the report. The general intent is to define economic and technically feasible options for the future direction for the Metro DES.
FVB presented to the DES Advisory Board at their August 16 meeting a summary slide presentation of their findings. View the District Energy System Program Report and the Metro District Energy System Program Options Report Presentation.