Repair Facing South After After repair facing south under 7th avenue Repair Facing South Before Before repair facing south under 7th avenue Repair Facing North2 After After repair facing north under 7th avenue Repair Facing North 2 Before Before repair facing north under 7th avenue Repair Facing North After After repair facing north under 7th avenue Repair Facing North Before Before repair facing north under 7th avenue Repair Facing East After After repair facing east on Broadway Repair Facing East Before Before repair facing east on Broadway Concrete Mixture This creates a new interior tunnel surface a minimum of 4" thick Concrete Mixture A concrete mixture (shotcrete) was then blown onto the walls and ceiing of the tunnel Heavy Wire Mesh Heavy wire mesh fabric was attached to the tunnel walls and ceiling leaving a 2" gap between the wire and the surface Categories: Extensive Tunnel Repair, GalleryDecember 12, 2018Album navigationPreviousPrevious album:Chilled Water Pump Upgrades Project CompletedNextNext album:Music City Convention Center Service Lines Installed